Weekend Engine Work

I spent some time in the cold garage last night and managed to get the exhaust side of the engine back together. Painted the exhaust manifold, installed all new gaskets, cleaned the block, put the new water pump on, and installed the NISMO engine mount on that side.

/home/wpcom/public_html/wp-content/blogs.dir/f50/10309154/files/2014/12/img_6552.jpg

Next step is to take care of the intake side: clean the block, install new coolant hoses, loop the heater core, etc. Should hopefully have the engine back on the ground and ready to bolt up to the transmission (when the clutch shows up) within a couple of days!

Damon

This entry was posted in Uncategorized. Bookmark the permalink.

3 Responses to Weekend Engine Work

  1. nathanong87 says:

    back to the future.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s